- Project Name: Park Pavillion
- Client: Sulphur Springs Parks & Recreation
Park Pavilion City of Sulphur Springs
Project Overview
DTE gives back to the community by donating materials and labor to build a pavilion at the city park. A mix of wood and steel framing was used to build the set deck. The team was able to donate and install over 100 loads of dirt to fill void from old city pool demolition.
Services
- Provided all fill dirt, placement and compaction in 8” lifts, after city pool was demolished.
- Provided the concrete foundation per engineered specifications for a 60 x 100 pavilion.
- Install weld plates and underground electrical.
- Install square tubing column.
- Install glue lam beams and decking supplied by city per engineered specifications.
- All materials and workmanship donated to the city at no charge.